Find below the list of public deliverables developed within the framework of iPRODUCE.

D2.1. Stakeholder Requirements for UDI in the Consumer Goods Products

Lead: WR
Delivery: June 2020 (M6)
Status: submitted

View deliverable

Download now

D2.2. Stakeholder Requirements for UDI in the Consumer Goods Products 2

Lead: WR
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D2.3. Benchmarking Report on Makers Approaches and Tools for collaborative production engineering

Lead: VLC
Delivery: October 2020 (M10)
Status: Submitted

View deliverable

Download now

D2.4. Report on Co-creation and Open Innovation Methods for social manufacturing

Lead: CBS
Delivery: June 2020 (M6)
Status: submitted

View deliverable

Download now

D2.5. Definition of iPRODUCE demonstration framework

Lead: MAT
Delivery: December 2020 (M12)
Status: Submitted

View deliverable

Download now

D2.6. iPRODUCE Social Manufacturing Vision and Reference Model

Lead: CERTH
Delivery: November 2020 (M11)
Status: Submitted

View deliverable

Download now

D2.7. iPRODUCE Social Manufacturing Vision and Reference Model 2

Lead: CERTH
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D3.2. cMDFs manufacturing capability map and repository

Lead: MAT
Delivery: December 2020 (M12)
Status: submitted

View deliverable

Download now

D5.1. Assistive and Collaborative Designing Methods and Tools

Lead: FIT
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D5.3. Generative Design Platform as Social Community

Lead: SAG
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D5.11. Collaborative Testing and Training Sessions

Lead: FIT
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D6.1. Engagement and ecosystem establishment review report

Lead: WR
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D7.1 Analysis of Market Trends and Practices in Collaborative Production Engineering and Co-creation

Lead: CBS
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D9.1 Evaluation methodology, plan and metrics

Lead: AIDIMME
Delivery: December 2020 (M18)
Status: submitted

View deliverable

Download now

D9.2. Evaluation methodology, plan and metrics 2

Lead: AIDIMME
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D10.1. Content Marketing and Growth Hacking Playbook

Lead: F6S
Delivery: March 2020 (M3)
Status: submitted

View deliverable

Download now

D10.2 Content Marketing and Growth Hacking Playbook 2

Lead: F6S
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

D10.4. Report on Cooperation Activities

Lead: F6S
Delivery: December 2020 (M12)
Status: submitted

View deliverable

Download now

D10.9. iPRODUCE Sustainability and Exploitation Plan

Lead: EDLUX
Delivery: June 2021 (M18)
Status: submitted

View deliverable

Download now

// Deliverables to be developed at a later stage //
D3.1. Lean Operational Model for cMDFs’ Federations

Lead: TS
Delivery: December 2021 (M24)

In development

D2.8. iPRODUCE Social Manufacturing Vision and Reference Model 3

Lead: CERTH
Delivery: December 2022 (M36)

In development